Problem
Heat escapes at junctions causing thermal bridging
Assessment
Identify junction risk areas during design phase
Insulation
Continuous insulation wraps corners and connections
Materials
Use thermal breaks gaskets and aerogels at junctions
Details
Specify robust junction details in construction drawings
Verification
Onsite inspections confirm junction insulation continuity

Preventing Thermal Bridging at Junctions: Ultimate 7 Tips

Preventing Thermal Bridging at Junctions: A Comprehensive Guide

In the realm of modern construction, preventing thermal bridging at junctions is imperative for lowering energy bills and avoiding condensation. At Simple Solutions 4 U, we combine 15 years of expertise in through-coloured renders, plasters and external wall insulation systems to create envelopes that stay thermally unbroken. For personalised advice, get in touch today.

Understanding Thermal Bridging and Its Impact

Thermal bridges form where insulation is interrupted—typically at wall-to-roof, wall-to-floor or window junctions—allowing heat to escape. Studies show they can account for up to 30 % of total fabric heat loss. Eliminating these weak points improves U-values, cuts heating costs and curbs carbon emissions. For an in-depth overview of why thermal bridges occur and how to design them out, see Saint-Gobain’s guide to thermal bridging.

Our high-performance EWI boards, fixed with thermally broken fixings and reinforced with glass-fibre mesh, maintain insulation continuity even at complex details.

Why Junctions Are Prone to Thermal Bridging

Junctions involve multiple materials—timber studs, steel beams, masonry—that conduct heat at different rates. Without airtight joint sealants and correct detailing, these interfaces become energy leaks. Early design reviews and on-site audits minimise risk. Practical design tactics are outlined in Premier Guarantee’s technical article on preventing thermal bridges.

Key Strategies for Preventing Thermal Bridging

1. Continuous Insulation Layers

Wrap corners and edges with unbroken insulation. Our CT 85 flexible adhesive bonds EPS or mineral-wool boards securely, while mesh corner beads protect vulnerable edges. If you’re retrofitting, follow the best-practice checklist in EWI Specialist’s guide to thermal bridging.

2. Thermal Breaks & Low-Conductivity Materials

Insert spacers or aerogel strips where steel penetrates façades. For rapid installs, the CT 84 express foam adhesive fills gaps and stops conductive fixings acting as bridges. Explore advanced aerogel solutions at Thermablok Aerogel for space-critical junctions.

3. Robust Window & Door Reveals

Use insulated cavity closers and set frames back within the insulation line. Protect reveals with PVC stop beads then finish with high-flexibility silicone render for a watertight seal. For deeper guidance on fenestration transitions, consult Thermal Bridging Solutions’ window break guide.

Materials & Tools That Make the Difference

Installation Best Practices

Survey → Specify → Install → Verify. Our PAS 2035-aligned workflow starts with a survey to pinpoint cold bridges, then specifies products such as silicone façade paint for added weatherproofing. Final blower-door tests confirm airtightness. For site-based checklists, download the SCI guidance on avoiding thermal bridging.

Common Mistakes to Avoid

Skipping sealant at board joints, neglecting eaves detailing or using metal fixings without spacers will defeat your insulation gains. Consult our technical blog for deeper troubleshooting or read about condensation risks. Additional pitfalls are covered in AC Architects’ self-build cold-bridging guide.

Benefits of Getting It Right

Projects completed with our systems have reported up to 40 % heating-energy cuts and improved EPC ratings. Explore a real-world retrofit in our Carlton re-rendering case study. For broader market data on energy savings, read the Recticel Insulation article on bridging prevention.

Future-Proof Your Build

Future Homes Standard 2025 demands tighter thermal-bridge limits. By integrating solar-reflective renders and bio-based boards, you’ll stay ahead of regulation while lowering embodied carbon. For forward-looking strategies, see Partel’s insights on low-energy construction.

Need Expert Support?

Whether you’re DIY or managing a large-scale development, our team provides product supply, site support and full rendering services. Visit simplesolution4ushop.co.uk or call 07877 329 472 to start preventing thermal bridging at every junction.

Share the Post:

Related Posts

This Headline Grabs Visitors’ Attention

A short description introducing your business and the services to visitors.